Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Abeysinghe, G and Urand, D (1999) Why Use Enactable Models of Construction Processes?. Journal of Construction Engineering and Management, 125(06), 437–47.

Kartam, S (1999) Generic Methodology for Analyzing Delay Claims. Journal of Construction Engineering and Management, 125(06), 409–19.

Lee, H, Lee, J and Lee, J (1999) Nonshored Formwork System for Top-Down Construction. Journal of Construction Engineering and Management, 125(06), 392–9.

Leu, S and Yang, C (1999) GA-Based Multicriteria Optimal Model for Construction Scheduling. Journal of Construction Engineering and Management, 125(06), 420–7.

Leung, A W T and Tam, C M (1999) Models for Assessing Hoisting Times of Tower Cranes. Journal of Construction Engineering and Management, 125(06), 385–91.

Lippiatt, B C (1999) Selecting Cost-Effective Green Building Products: BEES Approach. Journal of Construction Engineering and Management, 125(06), 448–55.

Ndekugri, I (1999) Performance Bonds and Guarantees: Construction Owners and Professionals Beware. Journal of Construction Engineering and Management, 125(06), 428–36.

Zouein, P P and Tommelein, I D (1999) Dynamic Layout Planning Using a Hybrid Incremental Solution Method. Journal of Construction Engineering and Management, 125(06), 400–8.